BIM-Based Full Lifecycle Collaborative Design Delivery Standards

BIM collaborative design standards for small-to-medium design firms

Research Overview

BIM adoption has long suffered from "model-use disconnection." This research develops BIM standards for small-to-medium firms based on 5 project experiences.

Problem Diagnosis

Survey of 30 design firms: 72% build models unused after design. Key barriers: inconsistent LOD (58%), model info issues (47%), cross-platform data loss (38%).

Five-Level LOD Delivery Standards

LOD100 concept → LOD200 schematic → LOD300 construction docs → LOD400 fabrication → LOD500 operations, covering 5 disciplines and 136 checkpoints.

Multi-Discipline Coordination Checklist

136 coordination checkpoints across 5 disciplines: design coordination (82), construction reserves (35), operational requirements (19).

Implementation & Open Source Plan

Piloted in 5 projects: model reuse 35%→82%, design changes -40%, rework -25%. Open-source release planned for 2025 with docs, templates, scripts, and training.

Other Research

Future Habitat Morphology: From Functional Units to Relational Networks

Anchored in individual roles, exploring new symbiotic relationships between humans, space, and technology in future society.

Livability of Vertical Communities in High-Density Cities

Focusing on vertical community practices in East Asian high-density urban contexts, evaluating spatial quality, social interaction, and community identity.

Cultural Resilience Theory in Industrial Heritage Regeneration

Proposing a "cultural resilience" theoretical framework for industrial heritage regeneration.

Comparative Study of Waterfront Regeneration Strategies in the Pearl River Delta

Comparing waterfront regeneration practices in Guangzhou, Shenzhen, and Zhuhai to extract replicable paradigms.

Top